Title:Tripoli (LHA 7) Deckhouse Lift
File Size:80.9 MB

The lifting of the deckhouse is a major event in the ship’s construction schedule and begins the integration of the three largest sections of the ship. The Tripoli (LHA 7) deckhouse was installed on Saturday, July 9, 2016, three weeks ahead of schedule.